Wahaca, London SE1

A new restaurant built from shipping containers was added to the Southbank on top of the existing Queen Elizabeth Hall, with the top floor containers overhanging those below. Our design ensured the loads were transmitted through the existing structure without the need for strengthening works so that the spaces below could continue to be used by members of the public.

Completed 2012.

Client
Southbank Centre

Architect
Softroom

<< View featured Structures projects